LCNG Cryogenic Filling Pump with Mobile Skid Mounted Equipment

LCNG Cryogenic Filling Pump with Mobile Skid Mounted Equipment

Model No.︰NTYT/SBP

Brand Name︰ NTYT

Country of Origin︰-

Unit Price︰-

Minimum Order︰1 pc

Inquire Now

Product Description

Quick Details

  • Place of Origin: Sichuan, China (Mainland)
  • Brand Name: NTYT
  • Model Number: NTYT/SBP
  • Theory: Reciprocating Pump
  • Structure: Piston Pump
  • Usage: Air Pump
  • Power: Electric
  • Standard or Nonstandard: Standard
  • Fuel: as every clident's require
  • Pressure: Intermediate pressure
  • Application: Cryogenic

Packaging & Delivery

Packaging Details: Seaworthy Packing.
Delivery Detail: 30 days

Specifications

1. Large Flow LCNG Cryogenic Filling Pump; 
2. Long service life; 
3. Medium: LNG,LO2, etc.; 
4. Wide usage. 

Main Technical Paramters:

 

 

Project Name LNG filling stations technical indicators
Capacity 50m3
Daily Filling Capacity Above 15000Nm3
Max. Working Pressure 1.6MPa
Measuring Accuracy ≥±1%
Energy Consumption <0.05kwh/Nm3
Precooling Time 2~4min
Each Aerated Time Under 30s
Unloading Time Under 1.5h
Liquid Utilization ≥95%
Evaporation Rate 0.002
Noise 55dB
Working Life 5000h
Main Function Security monitoring system for leakage,deflagration,fire,and production;alarm sustem and energency protective function.

******************************************************************************************
Contact information:

Company Name: Sichuan New Tianyuan Technologies Co., Ltd.
Address: No.666, Jinfu Road, Jinniu District, Chengdu 610031, Sichuan Province, P.R.China
Website: www.ntytgasequipment.com       http://www.chnequipment.com
Email: newtianyuan@ntytgasequipment.com
Tel: +86 28 86799916                    Fax: +86 28 61668788
WhatsApp: 008613908096496 
WeiXin(WeChat): ntytech 
Skype: Davidyzq

******************************************************************************************

Price Terms︰ FOB Shanghai, Tianjin

Payment Terms︰ L/C, D/P, T/T, Western union

Packing︰ Exportable seaworthy polywood box or as required

Lead Time︰ 30 days after receiving L/C, T/T